Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
View Content in Hindi
National Emblem of India

About SR

General Info

News & Updates

Tenders

Supplier Information

Passenger Services

Contact Us

Personnel Branch Information
Pension Adalat - 2017
Results-2017
RRB Allotment
Re-engagement of Retired Railway Stenographers
Sports_Recruitment-2018
Engagement of Contract Doctors
HQSBF
Appointment of Dental Surgeon
Appointment of Senior Resident - 2018
PTJ-S&T-Workshop
Para Medical Staff
Staff Benefit Fund
Security Branch Information
Weekly Rake Supply Position
Construction Organisation
State wise Achievement Booklets
Railway Electrification
Accounts Department Information
News & Announcements
Goldenrock Workshop
Electrical Department
Carriage & Wagon Workshop
Signal & Telecom Workshop
Locomotive Workshop
Engineering Workshop
Chennai Division
Madurai Division
Trichchchirappalli Division
Palghat Division
Trivandrum Division
Salem Division
Hamsafar
Press Releases
Press Release -Divisions
Chennai
Trichchirappalli
Madurai
Palghat
Trivandrum
Salem
Newsletter
Current Events
Train Accidents Inquiry Reports
MR Initiatives
 
Bookmark Mail this page Print this page
QUICK LINKS
71/2019-2022-05-2019
CHENNAI
CHANGES IN THE PATTERN OF SUBURBAN TRAIN SERVICES ON 25th and 26th MAY

Line Block and Power Block is permitted in Chennai – Arakkonam section between Thiruninravur and Tiruvallur at Vepampattu Railway Station Yard o­n UP & DOWN and fast lines for 12 hours from 22.15 hrs of Saturday 25th May 2019 to 10.15 hrs of Sunday 26thMay, 2019 for the work of construction of Passenger Subway. Details of the Block and repercussion of train services are given below.

TRAINS FULLY CANCELLED o­n SATURDAY, 25THMAY, 2019

·         Train No. 43437 MMC – Arakkonam EMU local leaving MMC at 21.15 hrs

·         Train No. 43125 MMC– Pattabiram Siding EMU local leaving MMC at 21.40 hrs

·         Train No. 43253 MMC – Tiruvallur EMU local leaving MMC at 21.40 hrs

·         Train No. 43661 Chennai Beach–Avadi EMU local leaving at 21.45 hrs

·         Train No. 43025 MMC – Avadi EMU local leaving MMC at 22.00 hrs

·         Train No. 43439 MMC – Arakkonam EMU local leaving MMC at 22.10 hrs

·         Train No. 43127 MMC– Pattabiram Siding EMU local leaving MMC at 22.35 hrs

·         Train No. 66009 MMC – Arakkonam EMU local leaving MMC at 22.45 hrs

·         Train No. 43255 MMC – Tiruvallur EMU local leaving MMC at 23.10 hrs

·         Train No. 43663 Chennai Beach – Avadi EMU local leaving at 23.15 hrs.

·         Train No. 43257 MMC – Tiruvallur EMU local leaving MMC at 23.45 hrs

·         Train No. 43029 MMC – Avadi EMU local leaving MMC at 23.25 hrs

·         Train No. 43892 Pattabiram Siding - Avadi EMU local leaving at 23.55 hrs

·         Train No. 43132 Pattabiram Siding - MMC EMU local leaving at 22.45 hrs.

·         Train No. 43258 Tiruvallur - MMC EMU local leaving Arakkonam at 20.50 hrs.

·         Train No. 43260 Tiruvallur - MMC EMU local leaving Tiruvallur at 21.55 hrs

·         Train No. 43428 Arakkonam-MMC EMU local leaving Arakkonam at 18.55 hrs

·         Train No. 66054 Tiruvallur - Avadi EMU local leaving Tiruvallur at 22.10 hrs

·         Train No. 43438 Arakkonam-MMC EMU local leaving Arakkonam at 21.45 hrs.

·         Train No. 43844 Arakkonam-Avadi EMU local leaving Arakkonam at 21.55 hrs.

·         Train No. 43520 Tiruttani - MMC EMU local leaving Tiruttani at 21.45 hrs

 

TRAINS PARTIALLY CANCELLED o­n SUNDAY, 26THMAY, 2019

·         Train 66047 MMC – Tirupati Fast EMU leaving MMC at 09.50 hrs is partially cancelled between MMC – Arakkonam. This train will run from Arakkonam to Tirupati.

·         Train No. 66016 Arakkonam – Chennai Beach Fast EMU leaving Arakkonam at 06.25 hrs is partially cancelled between Arakkonam – Avadi. This train will run from Avadi to Chennai Beach.

97 SUBURBAN TRAIN SERVICES FULLY CANCELLED o­n SUNDAY, 26TH MAY, 2019

Due to the line block 30 EMU services from MMC, 9 EMU services from Chennai Beach, 3 EMU services from Avadi, 1 EMU service from Thiruvallur and 1 EMU service from Ennore towards Avadi, Tiruvallur, Pattabiram Siding, Tiruttani, Kadambattur and Arakkonam are fully cancelled (total 44 EMU trains) from 01.20 hrs to 10.45 hrs o­n 26th May, 2019

Similarly, in the return direction, 39 EMU Services from Avadi, Tiruvallur, Pattabiram Siding, Tiruttani, Kadambattur, Arakkonam, Ponneri and Vellore to MMC, 11 EMU services to Chennai Beach, 1 EMU service to Velachery, 1 EMU service to Ponneri and 1 EMU service to Arakkonam are fully cancelled (total 53 EMU trains) from 03.20 hrs to 07.20 hrs o­n 26th May, 2019.

PASSENGER SPECIALS o­n SATURDAY/SUNDAY, 25TH& 26th MAY, 2019

In lieu of the cancelled trains, passenger specials in the section will be run as below to help the passengers :-

On SATURDAY 25th May 2019, there will be two passenger specials from MMC to Avadi at 22.15 hrs, and 23.55 hrs, and two passenger specials from MMC to Arakkonam at 23.45 hrs and 23.50 hrs, and One passenger specialfrom Velachery to Avadi at 21.25 hrs.

In return direction On SATURDAY 25th May 2019, there will be two passenger specials from Arakkonam to MMC at 21.55 hrs and 22.00 hrs, One passenger special from Thiruvallur to Avadi at 22.40 hrs, and One passenger special from Tiruttani to MMC at 22.00 hrs, and o­ne passenger special from Thiruvallur to MMC at 22.55 hrs.

On SUNDAY 26th May, 2019, there will be five passenger specials from MMC to Arakkonam at 05.20 hrs, 06.15 hrs, 07.35 hrs, 08.05 hrs and 08.45 hrs.

In return direction o­n SUNDAY 26th May 2019, there will be four passenger specials from Arakkonam to MMC at 04.40 hrs, 06.00 hrs, 06.40 hrs and 09.15 hrs and one passenger special from Vellore to Chennai Beach at 06.00 hrs. These Passengers specials will run o­n fast line between Arakkonam – Thiruvallur stations and hence will not stop at Senji Panambakkam.

 

THE WORK :-

Chennai Division is doing the work of erection of 5 metres  x 2.75 metres sized R.C.C boxes for the pedastrain subway at Veppampattu in Chennai – Arakkonam line. The work is taken up from Saturday Night till Sunday Morning thus ensuring that there is least disruption to regular train services. This subway is constructed for the use of passengers crossing the tracks at Veppampattu Station. Hence tresspassing by the public will be prevented o­n completion of this work. The subway is spread over four lines (Slow EMU and Fast express trains up and DN ) and the area available for machine working is limited. This major work had been planned o­n Two blocks of 12 hours o­n 18/19.05.2019 and 25/26.05.2019. In the first block taken up o­n the last week end  of 18/19th May 2019, the subway portion beneath the EMU slow up and DN lines were completed. During the block 8 box segments have been erected. Utilising this block period, 5 kms track has been packed in the section and other track maintenance works like through Rail Renewal for two Points and Crossing has been done in the section. Similarly, during the block period o­n 25th and 26th, the rest of the work for placing 8 box segments for the pedestrian subway underneath the tracks is expected to be completed.

 

 


Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.faceook.com/Southern-Railway-240606622749869

 



(D. Om Prakash Narayan)
Sr.PRO




  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.