Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
View Content in Hindi
National Emblem of India

About SR

General Info

News & Updates

Tenders

Passenger Services

Contact Us

Personnel Branch Information
ACT APPRENTICES 2022-23
Reservation Rules
Engagement of Teachers on Contract-MDU
Re-engagement of Retired Para Medical Staff
Engagement of Contract Teachers - Erode
Pension Adalat-2023
Engangement of homeopathy Consultant - PTJ
SRHQPB Website
PB CIRCULARS
Online Holiday Home Portal
Online CGA Portal
Division/Workshop Allotment
Construction Organization
Railway Electrification
Accounts Department Information
Careers
News & Announcements
Goldenrock Workshop
Electrical Department
Carriage & Wagon Workshop
Signal & Telecom Workshop
Locomotive Workshop
Engineering Workshop
Chennai Division
Palghat Division
Madurai Division
Trichchchirappalli Division
Thiruvananthapuram Division
Salem Division
Press Releases
Press Release -Divisions
Chennai
Trichchirappalli
Madurai
Palghat
Thiruvananthapuram
Salem
Current Events
Train Accidents Inquiry Reports
 
Bookmark Mail this page Print this page
QUICK LINKS
4/2023-2405-04-2023
Chennai
Maximum Permissible Speed has been enhanced in sections spanning a total of 2037 Route Kms


 

   Maximum Permissible Speed has been enhanced in sections spanning a total of 2037 Route Kms

44 train services have been speeded up during FY 2022-23

Chennai – Gudur & Arakkonam – Jolarpettai sections authorized for speed enhancement to 130 kmph

Southern Railway’s strategic planning and time bound execution of Speed enhancement works have yielded results during the financial year 2022-2023 ending 31st March 2023.    In the route spanning 2037 Kms, speed enhancement works have been successfully completed during the year.  Further, speed has been enhanced in loop lines of various sections of Southern Railway for an aggregate length of 1445 Route kms across the zone. 


As a result, 44 train services have been speeded up during the last fiscal in Southern Railway.

Speed raised over 2037 Kms of SR network in FY 2022-23

As a result of speed enhancement works over 2037 Route Kms of Southern Railway network, many vital sections have been authorised to handle trains at higher speeds in FY 2022-2023. 

Sections in which Maximum permissible speed increased to 130 Kmph

Over 413.62 Route Kms of Southern Railway network, the maximum permissible speed has been enhanced to 130 kmph from 110 kmph as given below:

lChennai - Renigunta section spanning 134.3 Route Kms has now been authorised for speed increase from the existing 110 kmph to 130 kmph since 29th March 2023.

lArakkonam – Jolarpettai section (144.54 Km) has been authorised for increasing maximum permissible speed to 130 kmph from 110 kmph from 31st March 2023.

lChennai - Gudur section became the first section in Southern Railway to be authorised for increasing maximum permissible speed to 130 Kmph from 110 kmph from October 2022.

Sections with Maximum permissible speed of 110/100 Kmph

In various important sections across the zone covering a network of 1218 Kms the maximum permissible speed has been enhanced to 110 Kmph and for a network spanning 406 kms the maximum permissible speed of various sections has been enhanced upto 100 Kmph during the financial year 2022-23. The details of the section are enclosed in Annexure –A.

Speed increase in loop lines

Speed of loop lines in various stations across Southern Railway has been increased from the existing 15 kmph to 30 kmph for an aggregate length of 1445 Route Kms.This helps in improving operational efficiency and reducing overall transit time for passengers.

Speed enhancement works

As part of systematic and planned efforts to strengthen track, traction and signaling systems which is crucial for enhancing the sectional speed, a comprehensive upgrade of all the infrastructure required for train operations was carried out by Southern Railway. These works involved Complete Track Renewal, Strengthening of bridges, easing of curves wherever feasible, barricading or construction of walls at locations where there is heavy trespassing, improving signalling system by providing automatic signalling /double distancing signal and improving OHE infrastructureand thereby duly removing the infringement to enhance the speed

Consequent to speed increase across various sections,  44 train services have been speeded up across Southern Railway during the year 2022-23 easing the travel time for passengers.  This speed increase will also improve the overall efficiency of the zone besides giving a fillip to freight operations. 

Southern Railway reaffirms its commitment to offer safe and punctual train operations and reduced transit time for passengers.




(B.Guganesan)
Chief Public Relations Officer




  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.